TM 1-1520-238-23
4-580
Change 1
4.168.
CPG POWER QUADRANT REMOVAL/INSTALLATION continued
c. Install rod end (6) on power lever (7). Torque
nut (10) 14 to 18 INCH-POUNDS.
(1) Set No. 1 power lever (7) to IDLE.
(2) Install bolt (9) through power lever (7) and rod
end (6).
(3) Hold bolt (9). Install nut (10). Torque nut (10)
to 14 INCH-POUNDS. Use torque wrench.
(4) Increase torque to aline cotter pin hole, but do
not exceed 18 INCH-POUNDS.
(5) Install new cotter pin (8).
d. Install rod end (1) on power lever (2). Torque
nut (5) 14 to 18 INCH-POUNDS.
(1) Install bolt (4) through power lever (2) and rod
end (1).
(2) Hold bolt (4). Install nut (5). Torque nut (5) to
14 INCH-POUNDS. Use torque wrench.
(3) Increase torque to aline cotter pin hole, but do
not exceed 18 INCH-POUNDS.
(4) Install new cotter pin (3).
e. Inspect (QA).
f. Install console panels CL1 and CL3 (para 2.2).
g. Perform power plants maintenance operation-
al check (engine 1 and engine 2)
(TM 1-1520-238-T).
END OF TASK
M04-1197-9
10
8
6
7
9
1
M04-1197-10
5
3
4
2