TM 1-1520-238-23
4-581
4.169.
CPG POWER QUADRANT DISASSEMBLY/ASSEMBLY (AVIM)
4.169.1. Description
This task covers:
Disassembly. Cleaning. Inspection. Repair. Assembly.
4.169.2. Initial Setup
Tools:
Electrical tool kit (item 378, App H)
Light duty laboratory apron (item 27, App H)
Industrial faceshield (item 129, App H)
Chemical protective gloves (item 154, App H)
Electric gun type heater (item 163, App H)
10-ton hydraulic hand operated arbor press (item 236,
App H)
Materials/Parts:
Primer coating (item 147, App F)
Wire (item 226, App F)
Personnel Required:
68X
Armament/Electrical System Repairer
68X3F
Armament/Electrical System Repairer/
Technical Inspector
References:
TM 55-1500-322-24
TM 55-1500-323-24
Equipment Conditions:
Ref
Condition
4.196
CPG power quadrant No. 1 engine out
disable switch removed
4.197
CPG power quadrant No. 2 engine out
disable switch removed
4.198
CPG power quadrant lever release switch
removed
4.199
CPG BAT OVRD switch removed
4.200
CPG EMER HYD PWR switch removed
4.169.3. Disassembly
a. Remove ground wire end (1) from power
quadrant (2).
(1) Remove locknut (3), washer (4), and ground
wire end (1) from screw (5).
(2) Remove screw (5) from quadrant (2).
(3) Remove screw (6) from quadrant (2).
(a) Remove lockwire from screw (6).
(b) Remove screw (6), washer (7), and wire
clamp (8) from quadrant (2).
(4) Remove ground wire (9) from lever assembly
(10).
b. Remove power lever assembly (10) from pow-
er quadrant (2).
GO TO NEXT PAGE
M04-3927-1
2
7
6
1
4
5
3
9
10
8