TM 1-1520-238-23
4-595
4.169.
CPG POWER QUADRANT DISASSEMBLY/ASSEMBLY (AVIM) continued
i. Inspect (QA).
j. Install CPG EMER HYD PWR switch (para 4.200).
k. Install CPG BAT OVRD switch (para 4.199).
l. Install CPG power quadrant lever release switch (para 4.198).
m. Install CPG power quadrant No. 2 engine out disable switch (para 4.197).
n. Install CPG power quadrant No. 1 engine out disable switch (para 4.196).
END OF TASK