TM 1-1520-238-23
4-594
4.169.
CPG POWER QUADRANT DISASSEMBLY/ASSEMBLY (AVIM) continued
NOTE
Power lever handle has spring tension
from the trigger release spring. To pre-
vent loss of spring, hold spring while
installing handle.
(6) Install right power handle (15) on power lever
(16).
(a) Position spring (18) and handle (15) on
lever (16).
(b) Install screw (17) through lever (16) and
handle (15).
(7) Install left power handle (11) on power lever
(12).
(a) Position spring (14) and handle (11) on
lever (12).
(b) Install screw (13) through lever (12) and
handle (11).
h. Install ground wire end (1) on quadrant (2).
(1) Install ground wire (9) through lever assembly
(10).
(2) Install screw (6) through washer (7) and wire
clamp (8) into power quadrant (2).
(3) Lockwire five screws (21) and one screw (6)
together. Use wire (item 226, App F).
(4) Install screw (5) through quadrant (2).
(5) Install ground wire end (1), washer (4), and
locknut (3) on screw (5).
GO TO NEXT PAGE
M04-3927-26
17
15
11
14
13
18
16
12
2
M04-3927-27
2
7
6
1
4
5
3
9
10
21
