TM 1-1520-238-23
4-592
4.169.
CPG POWER QUADRANT DISASSEMBLY/ASSEMBLY (AVIM) continued
g. Install power lever assembly (10) in power
quadrant (2).
(1) Install power lever assembly (10) in power
quadrant (2).
(a) With power lever shaft flange facing for-
ward, slide lever assembly (10) in quad-
rant (2) until trigger releases (35) clear
left and right rubber seals (36) and (37).
(b) Rotate lever assembly (10) 90 degrees
counterclockwise.
(c) Position lever assembly (10) in quadrant
(2).
(2) Install shaft support plate (25) in quadrant (2).
(a) Install two screws (34) through quadrant
(2) and support plate (25).
(b) Install two washers (33) and locknuts (32)
on screws (34).
(c) Install screw (31) through aft end of quad-
rant (2), washer (30), and support plate
(25).
(d) Install washer (30) and locknut (29) on
screw (31).
(e) Install two screws (28) through forward
end of quadrant (2) and support plate
(25).
(f) Install two washers (27) and locknuts (26)
on screws (28).
GO TO NEXT PAGE
M04-3927-21
36
37
35
35
2
10
10
M04-3927-22
29
30
25
26
27
2
31
32
33
34
28
30
25