TM 1-1520-238-23
Change 1
4-631
4.179.
NO. 2 ENGINE LOAD DEMAND SPINDLE AFT CABLE INSTALLATION continued
c. Install seal (3) and firewall plate (4) on louver
enclosure (6).
(1) Install seal (3) and plate (4) between angle
(7) and enclosure (6).
(2) Install two screws (8) through washers (9),
seal (3), and plate (4) in enclosure (6).
(3) Tighten top nine screws (10) on angle (7).
d. Install cable (2) on forward cable (11). Torque
coupling nut (5) to 70 INCH-POUNDS.
(1) Install cable fitting (12) on forward cable fit-
ting (13).
(2) Install coupling nut (5) on forward cable (11).
(3) Hold cable (2) at flats (14). Torque nut (5) to
70 INCH-POUNDS. Use torque wrench and
crowfoot.
e. Install clamp (15) on support (16).
(1) Install clamp (15) on cable (2).
(2) Install screw (17) through support (16) and
clamp (15).
(3) Hold screw (17). Install washer (18) and nut
(19).
GO TO NEXT PAGE
M04-1206-5A
8
9
4
10
3
7
6
M04-1206-6
13
12
5
2
14
11
M04-1206-7A
M04-1206-8
19
18
2
15
16
17