TM 1-1520-238-23
4-632
Change 1
4.179.
NO. 2 ENGINE LOAD DEMAND SPINDLE AFT CABLE INSTALLATION continued
f. Install clamp (20) on bracket (21).
(1) Install clamp (20) on cable (2).
(2) Install screw (22) through bracket (21) and
clamp (20).
(3) Hold screw (22). Install washer (23) and nut
(24).
g. Install cable (2) on gearbox (25). Torque nut
(26) to 70 INCH-POUNDS.
(1) Install cable fitting (27) on gearbox fitting (28).
(2) Install coupling nut (26) on gearbox (25). Hold
cable flats (29). Torque nut (26) to 70 INCH-
POUNDS. Use torque wrench and crowfoot.
h. Inspect (QA).
i. Perform No. 1 and No. 2 engine load demand
spindle rigging check (para 4.184).
j. Secure access panel R200; install doors
T250L, T250R, T290L, T290R, and L325 (para
2.2).
END OF TASK
M04-1206-9
20
21
2
24
23
22
2
29
27
M04-1206-10A
28
25
26