TM 1-1520-238-23
4-735
4.199.
CPG BAT OVRD SWITCH REMOVAL/INSTALLATION (AVIM) continued
b. Install switch (1) in CPG power quadrant (2).
(1) Install switch (1) through lockring (6) so tab
(11) enters locator hole (12).
(2) Install switch guard (5), lockwasher (4), and
nut (3).
c. Inspect (QA).
d. Install CPG power quadrant light indicating
panel (para 4.195).
END OF TASK
1
2
6
11
12
5
4
3
M04-1133-5