TM 1-1520-238-23
4-731
4.198.
CPG POWER QUADRANT LEVER RELEASE SWITCH REMOVAL/INSTALLATION
(AVIM) continued
4.198.6. Installation
a. Install switch (7) in power quadrant (8).
(1) Install wires of switch (7) through power lever
(16).
(2) Apply sealing compound to threads of two
screws (12). Use sealing compound
(item 172, App F)
(3) Install two screws (13) through switch (7),
switch actuator (15), stop bar (14) washers
(11), lockwashers (10), and locknuts (9). Do
not tighten locknuts (9).
b. Adjust switch (7).
(1) Adjust switch (7) so actuator (15) strikes pow-
er quadrant guide (17) with 0.125 to 0.250
INCH of upward travel on release trigger (18).
c. Tighten two locknuts (9).
GO TO NEXT PAGE
10
1114
13
7
12
9
M04-3336-4
8
15
17
14
16
13
7
9
M04-3336-3