TM 1-1520-238-23
4-734
4.199.
CPG BAT OVRD SWITCH REMOVAL/INSTALLATION (AVIM) continued
4.199.3. Removal
a. Remove CPG BAT OVRD switch (1) from CPG
power quadrant (2).
(1) Remove nut (3), lockwasher (4), switch guard
(5), and lockring (6).
b. Identify and detach two wires (7) from switch
(1).
(1) Position switch (1) so wires (7) are accessi-
ble.
(2) Remove two screws (8), lockwashers (9), and
terminal lugs (10).
4.199.4. Cleaning
a. Wipe removed and attaching parts with a
clean rag.
4.199.5. Inspection
a. Check removed and attaching parts for
cracks. None allowed.
b. Check wires for cuts, cracks, and damaged
connections (TM 55-1500-323-24).
c. Check removed and attaching parts for corro-
sion (para 1.49).
4.199.6. Installation
a. Attach two wires (7) to switch (1).
(1) Install two screws (8) through lockwashers
(9), terminal lugs (10), into switch (1).
GO TO NEXT PAGE
2
6
5
4
3
M04-1133-3
7
1
7
10
9
8
M04-1133-4
108
9
7
1