TM 1-1520-238-23
6-460.2
Change 1
6.106A. TRANSMISSION INSTALLATION PREPARATION FOR SHIPMENT continued
6.106A.3. Preparation for Shipment
a. Obtain shipping container (1).
b. Remove shipping container cover (2).
(1) Unlock cover securing fasteners (3).
(2) Attach transmission sling (4) to four cover
lifting rings (5). Use sling set kit.
(3) Attach crane cable hook (6) to sling (4).
(4) Remove cover (2).
c. Remove crossbar (7) from container (1).
(1) Remove four nuts (8) and washers (9) from
securing rods (10).
(2) Loosen securing nut (11) on crossbar (7).
(3) Remove crossbar (7).
d. Remove transmission (12) (para 6.101).
GO TO NEXT PAGE
M04-5098-1
6
4
5
3
2
1
1
7
8
9
10
11
M04-5098-2
12