TM 1-1520-238-23
6-460.4
Change 1
6.106A. TRANSMISSION INSTALLATION PREPARATION FOR SHIPMENT continued
h. Install cover (2).
(1) Attach sling (4) to four cover lifting rings (5).
Use sling set kit.
(2) Attach crane cable hook (6) to sling (4).
(3) Position cover (2) on container (1).
(4) Aline cover securing fasteners (3) with bolts
(17) and tighten.
(5) Place all documents to be shipped with trans-
mission in the records receptacle (18).
END OF TASK
M04-5098-5
6
4
5
2
3
1
18
17