TM 1-1520-238-23
6-478
6.113.
TRANSMISSION INSTALLATION CONNECT RIGHT SIDE AREA continued
p. Install right hydraulic pump seal drain hose
(36) on union (37).
(1) Install nut (38) on union (37).
q. Install generator electrical lead (39) on ground
stud (40).
(1) Install lug (41), washer (42), and nut (43) on
stud (40).
(2) Install ties (44).
r. Attach connector P131 (45) on receptacle
J131 (46).
s. Install three clamps (47) and clamps (48).
(1) Install bolt (49), washer (50), clamp (47),
spacer (51), clamp (48), and spacer (52) in
transmission deck (53).
GO TO NEXT PAGE
36
38
37
M04-2972-8
44
43
42
40
39
41
44
M04-2972-6
45
M04-2972-12
46
52
51
48
50
49
47
M04-2972-11
TYPICAL THREE PLACES
53