TM 1-1520-238-23
9-44
9.11.
ELECTRICAL POWER DISTRIBUTION BOX ENCLOSED LINK FUSE/HOLDER BLOCK F1/XF1 OR
F2/XF2 REPLACEMENT continued
9.11.6. Installation
a. Install new holder block (2) in distribution box
(8).
(1) Position holder block (2) on distribution box
(8).
(2) Install two screws (9).
b. Install link fuse (1) on holder block (2).
(1) Install two washers (4), link fuse (1), three
identified wires (5), and one wire (6) on studs
(7).
(2) Install two washers (4) and nuts (3) on studs
(7).
c. Inspect (QA).
d. Install electrical power distribution box cover
(para 9.9).
e. Perform Hellfire missile system maintenance
operational check (TM 9-1427-475-20).
END OF TASK
2
8
M04-4197-4
9
M04-4197-5
2
7
3
7
4
4
5
4
4
6
1