TM 1-1520-238-23
9-150
9.43.
CPG CIRCUIT BREAKER PANEL NO. 1 REMOVAL/INSTALLATION
9.43.1. Description
This task covers:
Removal. Cleaning. Inspection. Installation.
9.43.2. Initial Setup
Tools:
Electrical tool kit (item 378, App H)
Ohmmeter (item 218, App H)
Personnel Required:
68X
Armament/Electrical System Repairer
68X3F
Armament/Electrical System Repairer/
Technical Inspector
References:
TM 1-1520-238-T
TM 55-1500-323-24
Equipment Conditions:
Ref
Condition
1.57
Helicopter safed
9.43.3. Removal
a. Enter pilot station (para 1.56). Observe all
safety precautions.
b. On pilot aft circuit breaker panel, open six
POWER circuit breakers.
c. Enter CPG station (para 1.56). Observe all
safety precautions.
d. Remove CPG circuit breaker panel No. 1 (1)
from console (2).
(1) Unlock six turn fasteners (3).
(2) Remove panel (1).
GO TO NEXT PAGE
CPG STATION
M04-1370-1
M04-1370-2
1
3
2