TM 1-1520-238-23
9-149
9.42.
MAINT LT OR APU CIRCUIT BREAKER REMOVAL/INSTALLATION continued
9.42.6. Installation
a. Attach two identified wires (4) to circuit break-
er (1).
(1) Install two screws (5) through washers (6)
and terminal lugs (7) into circuit breaker (1).
b. Install circuit breaker (1).
(1) Install circuit breaker (1) so that tab (8) seats
in locator hole (9).
(2) Install washer (3) and nut (2).
c. Inspect (QA).
d. Perform maintenance lights or auxiliary pow-
er unit maintenance operational check
(TM 1-1520-238-T).
e. Secure access door R295 (para 2.2).
END OF TASK
4
5
7
8
6
2
3
4
1
9
M04-1291-4