TM 1-1520-238-23
9-302
9.79.
PILOT OR CPG INSTRUMENT GLARESHIELD LIGHT REMOVAL/INSTALLATION continued
e. Remove light (1) from glareshield (2).
(1) Remove two screws (3) and washers (4) from
bracket (5).
(2) Remove end cap (6) from light (1).
(3) Remove light (1).
9.79.4. Cleaning
a. Clean removed and attaching parts (para
1.47).
9.79.5. Inspection
a. Check removed and attaching parts for dam-
age (para 9.61).
b. Check wires and terminals for wear, cracks,
and cuts (para 9.61).
c. Check removed and attaching parts for corro-
sion (para 1.49).
9.79.6. Installation
a. Install light (1) on glareshield (2).
(1) Install end cap (6) on light (1).
(2) Position light (1) on glareshield bracket (5).
(3) Install two screws (3) through washers (4)
and light (1) into glareshield bracket (5).
b. Perform
electrical
bond
check
(TM 55-1500-323-24).
(1) Bond shall be 1.0 OHM or less. Use
multimeter.
c. Inspect (QA).
d. Perform pilot or CPG utility and secondary
lights maintenance operational check
(TM 1-1520-238-T).
END OF TASK
M04-1262-2
2
1
4
3
5
6
M04-1262-4
2
1
4
3
5
6
