TM 1-1520-238-23
9-306
9.81.
CPG INTR LT PANEL REMOVAL/INSTALLATION continued
9.81.4. Cleaning
a. Clean removed and attaching parts (para
1.47).
9.81.5. Inspection
a. Check removed and attaching parts for dam-
age (para 9.61).
b. Check wires and terminals for wear, cracks,
and cuts (para 9.61).
c. Check removed and attaching parts for corro-
sion (para 1.49).
9.81.6. Installation
a. Attach connector P101 (4) to receptacle
(A181)J1 (5). Use socket head key set.
b. Inspect (QA).
c. Install panel (1) on console (2).
(1) Position panel (1) on console (2).
(2) Lock four turnlock fasteners (3).
d. Inspect (QA).
e. Perform CPG edge-lights maintenance opera-
tional check (TM 1-1520-238-T).
END OF TASK
5
BOTTOM
VIEW
1
2
3
4
M04-1251-3