TM 1-1520-238-23
9-336
Change 1
9.92.
FORMATION LIGHT REMOVAL/INSTALLATION continued
e. Remove vertical stabilizer formation light (13).
(1) Open access panel R578 (para 2.2).
(2) Identify and depin two wires (14) from splices
(15) (TM 55-1500-323-24).
(3) Remove wires (14) from tie mount block (16).
(4) Remove six screws (17) and washers (17.1).
(5) Remove light (13).
(6) Remove gasket (18).
9.92.4. Cleaning
a. Clean removed and attaching parts (para
1.47).
9.92.5. Inspection
a. Check removed and attaching parts for dam-
age (para 9.61).
b. Check wires and terminals for wear, cracks,
and cuts (para 9.61).
c. Check removed and attaching parts for corro-
sion (para 1.49).
9.92.6. Installation
a. Install wing tip formation light (1).
(1) Position gasket (5) and light (1) on wing (19).
(2) Install six screws (4) through washers (4.1),
light (1), and gasket (5) into wing (19).
(3) Pin two identified wires (2) to splices (3)
(TM 55-1500-323-24).
b. Inspect (QA).
c. Secure access doors LW8 or RW8 (para 2.2).
GO TO NEXT PAGE
18
15
13
17
M04-1247-4A
14
16
17.1
M04-1247-5A
1
3
2
5
4
19
4.1