TM 1-1520-238-23
9-419
9.114.
CPG CAUTION/WARNING PANEL REMOVAL/INSTALLATION continued
9.114.4. Cleaning
a. Wipe removed and attaching parts with a clean
rag.
9.114.5. Inspection
a. Check removed and attaching parts for dam-
age (para 9.104).
b. Check wires and terminals for wear, cracks,
and cuts (para 9.104).
c. Check connectors and receptacles for cracks,
broken connections, and bent or damaged
pins (para 9.104).
d. Check removed and attaching parts for corro-
sion (para 1.49).
9.114.6. Installation
a. Attach two connectors to CPG caution/warn-
ing panel (1).
(1) Attach connector P19 (4) to receptacle
(A157)J1 (5).
(2) Attach connector P31 (6) to receptacle
(A157)J2 (7).
b. Inspect (QA).
c. Install panel (1) in instrument panel (2).
(1) Lock four turn fasteners (3).
d. Perform
electrical
bond
check
(TM 55-1500-323-24).
(1) Bond shall be 0.0025 OHM or less. Use
ohmmeter.
e. Perform CPG caution and warning system
maintenance
operational
check
(TM 1-1520-238-T).
END OF TASK
M04-1295-3
1
6
5
4
7
M04-1295-4
1
2
3
