TM 1-1520-238-23
10-402
10.94.
PRESSURE FUEL MANIFOLD REMOVAL/INSTALLATION continued
d. Install fitting (11).
(1) Lubricate new gasket (16). Use petrolatum
(item 138, App F).
(2) Install new gasket (16) on mounting flange
(15).
(3) Place fitting (11) on gasket (16).
(4) Install four bolts (12), washers (14), and nuts
(13).
(5) Hold bolts (12). Tighten nuts (14).
(6) Perform electrical bond check on four bolts
(12) (TM 55-1500-323-24).
(a) Bond shall be 1.0 OHM or less. Use
multimeter.
(7) Seal heads of four bolts (12). Use sealing
compound (item 175, App F).
e. Install connector (6).
(1) Lubricate two new packings (10). Use
petrolatum (item 138, App F).
(2) Install one packing (10) on connector (8) and
one packing (10) on nut (7).
(3) Install retainer halves (9) between body (8)
and nut (7).
(4) Lubricate threads of body (8). Use petrolatum
(item 138, App F).
(5) Slide and hold body (8) over retainer halves
(9). Packings (10) should be located on the
outside of retainer halves.
(6) Connect nut (7) and body (8) and tighten.
GO TO NEXT PAGE
12
11
15
14 13
16
M04-352-12
10
9
10
M04-352-13
9
6
7
8
7
8
