TM 1-1520-238-23
10-497
10.119.
AFT FUEL CELL NITROGEN INERT BREAKAWAY VALVE REMOVAL/INSTALLATION continued
10.119.6. Installation
a. Install valve (5) on cover (9). Torque nut (6) to
120 INCH-POUNDS.
(1) Lubricate new packing (10). Use petrolatum
(item 138, App F).
(2) Install packing (10) in mount end of valve (5).
(3) Place valve (5) on cover (9). Install two bolts
(7) and washers (8).
(4) Install hose (11) on valve (5). Torque nut (6) to
120 INCH-POUNDS. Use torque wrench.
b. Inspect (QA).
c. Install panel (1).
(1) Aline panel (1) with mounting holes in trans-
mission deck (12).
(2) Lubricate 76 new packings with retainers (3).
Use petrolatum (item 138, App F).
(3) Install 56 screws (2) and packings with retain-
ers (3).
(4) Install 20 bolts (4) and packings with retainers
(3).
d. Apply sealing compound as fillet seal to panel
(1). Use sealing compound (item 175, App F).
GO TO NEXT PAGE
11
9
M04-2954-4
10
5
6
7
8
M04-2954-5
12
3
2
1
3
4