TM 1-1520-238-23
11-426
11.97.
CPG TO PILOT LATERAL F.S. 118.50 CONTROL BRACKET ASSEMBLY
REMOVAL/INSTALLATION continued
b. Remove bellcrank (2) from bracket assembly
(8).
(1) Remove and discard cotter pin (9).
(2) Remove nut (10).
(3) Remove bolt (11), washer (12), and bushing
(13) from bracket (8) and bellcrank (2).
(4) Remove bellcrank (2).
NOTE
A laminated spacer is installed between
the bracket and the airframe. Use care
when removing the bracket to prevent the
spacer from delaminating.
c. Remove bracket (8) from airframe (14).
(1) Remove four nuts (15) and washers (16).
(2) Remove two bolts (17) and two bolts (18).
(3) Remove bracket (8) and spacer (19).
11.97.4. Cleaning
a. Wipe removed and attaching parts with a
clean rag.
11.97.5. Inspection
a. Check removed and attaching parts for dam-
age (para 11.5).
b. Check removed and attaching parts for corro-
sion (para 1.49).
c. Check all installed bushing(s) and/or bear-
ing(s) for wear (para 11.5).
d. Check all removed bushing(s) and/or bear-
ing(s) for wear (para 11.4).
GO TO NEXT PAGE
M04-4330-3
9
111213
10
2
8
M04-4330-4
18
15
16
17
8
19
14
16
15