TM 1-1520-238-23
11-1248
Change 5
11.292.
RIGGING UPPER LATERAL FLIGHT CONTROLS continued
o. Install main rotor rigging plate (14) on right
side of mast base (15).
(1) Install rigging plate (14) on top of right side of
mast base (15). Use flight control rigging kit.
(2) Fasten clamps (16) under plate (14).
p. Adjust BASIC DIM pointer (17) to aline with
center of main rotor mixer alinement tool (18).
(1) Install large end of alinement tool (18) in later-
al link bolt (19) and hold.
(2) Install rigging fixture (20) next to alinement
tool (18). Use alinement tool (Figure D-474,
App D).
(3) Loosen thumbscrew (21) and adjust BASIC
DIM pointer (17) with center point of aline-
ment tool (18).
(4) Tighten thumbscrew (21).
(5) Mark shaft of fixture (20), using base of point-
er (17) as a reference. Use pencil.
q. Remove rigging fixture (20) from main rotor
rigging plate (14).
r. Remove alinement tool (18) from lateral link
bolt (19).
s. Remove main rotor rigging plate (14) from
right side of mast base (15).
(1) Loosen clamps (16).
(2) Remove plate (14).
GO TO NEXT PAGE
M04-3025-5
16
14
15
M04-3025-20
20
17
17
20
21
17
19
18
21
18
M04-3025-14
16
14
15
19
18
