TM 1-1520-238-23
12-119
12.37.
CPG FIRE BOTTLE SELECT SWITCH REPLACEMENT - continued
12.37.6. Installation
a. Enter CPG station (para 1.56). Observe all
safety precautions.
b. Attach wires (10) on new switch (6).
(1) Position identified wires (10) on terminals
(11).
(2) Install screws (12), washers (13), and termi-
nal lugs (14).
c. Install switch (6) on panel (2).
(1) Install lockwasher (9) on switch (6).
(2) Install switch (6) through control panel (2).
(3) Install lockring (8) and nut (7) on switch (6).
d. Install panel (4) on panel (2).
(1) Position panel (4) on panel (2).
(2) Install two screws (5).
e. Install panel (1) on panel (2).
(1) Position panel (1) on panel (2).
(2) Install five screws (3).
f. Inspect (QA).
g. Perform fire extinguishers maintenance op-
erational check (TM 1-1520-238-T).
END OF TASK