TM 1-1520-238-23
12-117
12.37.
CPG FIRE BOTTLE SELECT SWITCH REPLACEMENT
12.37.1. Description
This task covers:
Removal. Cleaning. Inspection. Installation.
12.37.2. Initial Setup
Tools:
Electrical tool kit (item 378, App H)
Personnel Required:
68X
Armament/Electrical System Repairer
68X3F
Armament/Electrical System Repairer/
Technical Inspector
References:
TM 1-1520-238-T
Equipment Conditions:
Ref
Condition
1.57
Helicopter safed
12.37.3. Removal
a. Enter pilot station (para 1.56). Observe all
safety precautions.
b. On pilot center circuit breaker panel, open
FIRE EXTGH PLT, CPG, and APU circuit break-
ers.
c. Enter CPG station (para 1.56). Observe all
safety precautions.
d. Remove access panel (1) from control panel
(2).
(1) Remove five screws (3).
(2) Remove panel (1).
GO TO NEXT PAGE
CPG STATION
M04-990-1
M04-990-2
3
1
2