16.27.3. Removal
a. Remove pylon switch (1) from bracket (2).
(1) Remove nut (3) and washer (4) from switch
(1).
(2) Remove switch (1) and lockring (5) from
bracket (2).
b. Detach wires (6) from switch (1).
(1) Remove sealant from terminal lugs (7) and
screws (8) on the back of switch (1).
(2) Identify three wires (6) and remove three
screws (8), washers (9), and terminal lugs (7)
from switch (1).
16.27.4. Cleaning
a. Clean any remaining sealant off terminal lugs.
Use naphtha (item 127, App F).
b. Clean removed and attaching parts (para
1.47).
16.27.5. Inspection
a. Check wires for wear, cuts, breaks, and dam-
aged terminal lugs (TM 55-1500-323-24).