TM 1-1520-238-23
3-163
3.45.
TAIL LANDING GEAR TRAILING ARMS REMOVAL/INSTALLATION continued
c. Install tube (1) on hose (2).
(1) Hold union (3) on tube (1).
(2) Tighten nut (4) on hose (2).
d. Install tube (1) on trailing arm (5).
(1) Install two clamps (9) on tube (1).
(2) Install two screws (6) through clamps (9),
spacers (10), and bonding strap (11).
(3) Hold two screws (6). Install washers (8) and
nuts (7).
(4) Perform
electrical
bond
check
(TM 55-1500-323-24).
(a) Bond shall be 0.0025 OHMS or less. Use
ohmmeter.
(5) Seal bonding area. Use sealing compound
(item 178, App F).
GO TO NEXT PAGE
LEFT SIDE
M04-0038-13
6
1
7
10
9
9
10
11
7
6
3
2
4
8
8
5