TM 1-1520-238-23
2-137
2.49.
BOW BEAM HANDLE REMOVAL/INSTALLATION
2.49.1. Description
This task covers:
Removal. Cleaning. Inspection. Installation.
2.49.2. Initial Setup
Tools:
Aircraft mechanics tool kit (item 376, App H)
0 - 75 inch-pound 1/4-inch drive dial indicator torque
wrench (item 446, App H)
Personnel Required:
67R
Attack Helicopter Repairer
67R3F
Attack Helicopter Repairer/Technical
Inspector
Equipment Conditions:
Ref
Condition
1.57
Helicopter safed
2.193
Wire strike protection aircraft cable cutter
blade removed
2.49.3. Removal
a. Remove bow handle (1) from upper bow beam
mounting bracket (2).
(1) Remove four nuts (3), washers (4), screws
(5), and handle (1) from bracket (2).
GO TO NEXT PAGE
M04-3542-3
M04-3542-1
3
4
5
1
2