TM 1-1520-238-23
2-262
SECTION V. CENTER FUSELAGE MAINTENANCE
2.75.
MAIN LANDING GEAR FUSELAGE FAIRING REMOVAL/INSTALLATION
2.75.1. Description
This task covers:
Removal. Cleaning. Inspection. Repair. Installation.
2.75.2. Initial Setup
Tools:
Aircraft mechanics tool kit (item 376, App H)
Personnel Required:
67R
Attack Helicopter Repairer
67R3F
Attack Helicopter Repairer/Technical
Inspector
Equipment Conditions:
Ref
Condition
1.57
Helicopter safed
3.18
Left or right main landing gear shock strut
removed
NOTE
This task is typical for left and/or right
fuselage fairings.
2.75.3. Removal
a. Remove main landing gear fuselage fairing (1)
from fuselage (2).
(1) Remove five screws (3) and two bolts (4)
from fairing (1).
(2) Remove fairing (1) from fuselage (2).
GO TO NEXT PAGE
M04-2669-1
M04-2669-2
1
3
4
2