TM 1-1520-238-23
Change 3
2-269
2.76.
MAIN LANDING GEAR LEFT SHOCK STRUT STRUCTURAL SUPPORT
REMOVAL/INSTALLATION continued
g. Install missile control panel (TM 9-1090-208-23-1).
h. Install stores jettison control panel (TM 9-1090-208-23-1).
i. Install pilot ELEC PWR panel (para 9.33).
j. Install main landing gear left fuselage fairing (para 2.75).
k. Install nontransparent barrier armor assembly (para 2.178).
l. Install access panels L120 and L135; install pilot left console panel PL5 (para 2.2).
m. Install ARCS display and control panel assembly (TM 9-1090-208-23-1).
END OF TASK