LEFT AFT SIDE TRANSMISSION ROTOR SUPPORT STRUT ASSEMBLY
REMOVAL/INSTALLATION continued
(6) Hold bolt (20). Use box wrench.
(7) Torque nut (21) to 3360 INCH-POUNDS. Use
torque wrench, adapter, and 5-inch
extension.
(8) Increase torque to aline cotter pin hole, but do
not exceed 3640 INCH-POUNDS.
(9) Install new cotter pin (19).
c. Install hose (11) on strut (2).
(1) Install clamp (16) on strut (2).
(2) Install screw (12) through clamp (15) and
(16).
(3) Hold screw (12). Install washer (14) and nut
(13).
d. Install cable (1) on strut (2).
(1) Install clamp (9) on strut (2).
(2) Install screw (3) through washer (6), clamp
(10), spacer (7), clamp (9), and washer (8).
(3) Hold screw (3). Install washer (5) and nut (4).
e. Inspect (QA).
f. Remove maintenance crane (para 1.105).
g. Remove air vehicle sling (para 1.79).
h. Install air data system (ADS) mast (para 6.90).
i. Install main deck fire/overheat detectors (para
12.32).
j. Install access panels L200 and L230 (para 2.2).
END OF TASK