TM 1-1520-238-232-3522.96.AFT NACELLE CARRY-THRU STRUT ASSEMBLY REMOVAL/INSTALLATION – continued2.96.3. Removala. Remove nacelle support strut (1) from nacellesupport post assembly (2).(1) Hold bolt (3). Remove self-locking nut (4) andwasher (5).(2) Remove bolt (3) and washer (6) from post (2).(3) Remove strut (1) from post (2).b. Remove strut (1) from center nacelle supportstrut (7).(1) Hold bolt (8). Remove self-locking nut (9) andwasher (10).(2) Remove bolt (8) and washer (11) from strut(7).(3) Remove strut (1) from strut (7).2.96.4. Cleaninga. Wipe removed and attaching parts and sur-faces with a clean rag.2.96.5. Inspectiona. Check struts for corrosion (para 1.49).b. Check strut end fittings for nicks, scratches,and elongated holes (para 2.12).c. Check struts for loose, missing, or broken riv-ets (TM 1-1500-204-23).GO TO NEXT PAGE191072M04-3845-34563118
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business