TM 1-1520-238-23
Change 1
2-355
2.97.
NACELLE CARRY-THRU POST ASSEMBLY REMOVAL/INSTALLATION continued
2.97.3. Removal
CAUTION
Do not stand on the nacelle work platform
when carry-thru post assembly is re-
moved or damage may occur.
a. Remove two wire harness loop clamps (1),
loop clamp (2), and clamp block (3) from left
nacelle post assembly (4).
(1) Remove two screws (5) and washers (6) from
clamps (1).
(2) Remove screw (7) from clamp (2) and clamp
block (3).
b. Remove ground jumper assembly (8) from left
post (4).
(1) Remove self-locking nut (9) and washer (10)
from ground stud (11).
(2) Remove jumper (8) from stud (11) and post
(4).
c. Remove four wire harness loop clamps (12)
(three places) and loop clamp (13) from right
nacelle post assembly (14).
(1) Remove screw (15) from two clamps (12),
spacer (16), two clamps (12), spacer (16)
(three places), and post (14).
(2) Remove screw (17) from clamp (13) and post
(14).
GO TO NEXT PAGE
4
2
6
5
7
3
M04-3846-6A
1
M04-3846-13
4
8
9
10
11
M04-3846-7A
15
12
16
13
17
14
14