TM 1-1520-238-23
2-354
Change 1
2.97.
NACELLE CARRY-THRU POST ASSEMBLY REMOVAL/INSTALLATION
2.97.1. Description
This task covers:
Removal. Cleaning. Inspection. Installation.
2.97.2. Initial Setup
Tools:
Aircraft mechanics tool kit (item 376, App H)
Light duty laboratory apron (item 27, App H)
Chemical protective gloves (item 154, App H)
Adjustable air filtering respirator (item 262, App H)
Materials/Parts:
Sealing compound (item 161, App F)
Personnel Required:
67R
Attack Helicopter Repairer
67R3F
Attack Helicopter Repairer/Technical
Inspector
References:
TM 1-1500-204-23
TM 55-1500-323-24
Equipment Conditions:
Ref
Condition
1.57
Helicopter safed
2.96
Nacelle carry-thru support assembly struts
removed as required
4.121
No. 1 or No. 2 engine inboard secondary
nozzle removed as required
15.40
APU exhaust duct removed
9.133
Stabilator relay box removed (when remov-
ing left side only)
NOTE
This task is typical for left and/or right
nacelle carry-thru support post, except as
noted.
GO TO NEXT PAGE
M04-3846-1
