TM 1-1520-238-23
Change 1
2-356.1
2.97.
NACELLE CARRY-THRU POST ASSEMBLY REMOVAL/INSTALLATION continued
2.97.4. Cleaning
a. Clean sealing compound residue (para 1.47).
b. Wipe removed and attaching parts and sur-
faces with a clean cloth.
2.97.5. Inspection
a. Check post for corrosion (para 1.49).
b. Check post for nicks, scratches, and cracks
(TM 1-1500-204-23).
c. Check post for loose, missing, or broken riv-
ets (TM 1-1500-204-23).
2.97.5. Installation
CAUTION
Do not stand on the nacelle work platform
when carry-thru post assembly is re-
moved or damage may occur.
a. Install post (4) on nacelle (18).
(1) Position post (4) on nacelle (18).
(2) Install four bolts (21) through washers (22)
and nacelle (18) in bottom section of post (4).
(3) Position post (4) on mount (25).
(4) Install four bolts (23) through washers (24)
and nacelle (18) in top of post (4).
(5) Install bolt (28) through recessed washer
(29), strut (30) and post (4).
(6) Install washer (27) and self-locking nut (26)
on bolt (28).
(7) Install two bolts (19) and washers (20) in
base of post (4).
GO TO NEXT PAGE
VIEW
ROTATED
1
18
23
24
4
26
27
28
29
30
25
21
22
18
4
20
19
M04-3846-11A
VIEW
ROTATED