TM 1-1520-238-23
Change 1
2-357
2.97.
NACELLE CARRY-THRU POST ASSEMBLY REMOVAL/INSTALLATION continued
d. Install jumper (8) on left post (4).
(1) Install jumper (8) on stud (11).
(2) Install washer (10) and nut (9) on stud (11).
(3) Perform
electrical
bond
check
(TM 55-1500-323-24).
(4) Apply sealing compound. Use sealing
compound (item 161, App F).
e. Install two clamps (1), clamp (2), and clamp
block (3) on left post (4).
(1) Install screw (7) through clamp (2) and clamp
block (3) into post (4).
(2) Install screw (5) through washer (6) and
clamps (1) into post (4).
f. Inspect (QA).
g. Install nacelle carry-thru support assembly
struts as required (para 2.96).
h. Install APU exhaust nozzle (para 15.40).
i. Install stabilator relay box (when installing left
side only) (para 9.133).
END OF TASK
M04-3846-12A
4
8
9
10
11
M04-3846-9
6
5
4
2
7
3
1