TM 1-1520-238-23
2-443
2.123.
NOSE GEARBOX FAIRING AND SHROUD REMOVAL/INSTALLATION continued
2.123.3. Removal
a. Detach connector P47 (1) from receptacle J47
(2) and connector (HR3)P2 (3) from receptacle
J2 (4) on nose gearbox No. 1.
b. Detach connector P48 (1) from receptacle J48
(2) and connector (HR4)P2 (3) from receptacle
J2 (4) on nose gearbox No. 2.
c. Remove screw (5), washer (6), clamp (7), and
spacer (8) from wire harness (9).
d. Remove and discard tiedown strap (10) and
rubber strip (11) from anchor (12).
CAUTION
To prevent damage to heater blanket
lead, do not allow forward fairing to hang
from heater blanket pigtail.
e. Remove forward fairing (13).
(1) Unlock four latches (14).
(2) Slide fairing (13) forward until clear of guide
pins (15).
f. Remove lower aft fairing (16).
(1) Remove three stud nuts (17).
g. Remove upper aft fairing (18).
(1) Remove four stud nuts (19).
GO TO NEXT PAGE
11
10
12
14
7
M04-2200-13
2
4
3
13
1
56
9
8
15
16
18
19
M04-2200-4
17