TM 1-1520-238-23
2-654
2.180.
TRANSPARENT CREW PROTECTION ARMOR BARRIER REPLACEMENT continued
b. Install right channel (17) in structure (2).
(1) Aline channel (17) with structure (2) and bar-
rier (26) mounting holes.
(2) Install 14 screws (18) and 10 screws (3)
through 24 washers (5), channel (17), and
structure (2).
(3) Install two screws (22) through upper right
clip (23), lower right clip (24), two washers
(25), channel (17), and barrier (26).
(4) Install two washers (20) and nuts (19). Tight-
en nuts (19) finger tight.
(5) Install three screws (21), washers (20), and
nuts (19) on channel (17) and barrier (26).
Tighten nuts (19) finger tight.
c. Install handle (15) on structure (2).
(1) Install two screws (16) through handle (15) in
structure (2).
NOTE
Steps d. and e. install mounting provi-
sions for canopy severance devices and
the pilot vertical glareshield. System
installation shall be completed after the
transparent barrier is installed.
d. Install strap (6) on inside of structure (2).
(1) Position strap (6) against inboard side of
channel (17) and structure (2) to aline mount-
ing holes.
(2) Install three bolts (10), two bolts (11), four
bolts (12), bolt (13), and three bolts (14)
through channel (17) and inboard strap (6) in
structure (2).
(3) Install six screws (9), washers (8), and nuts
(7) on channel (17) and barrier (26). Tighten
nuts (7) finger tight.
GO TO NEXT PAGE
26
M04-3437-15
3
5
5
18
3
5
3
5
3
5
2
19
20
21
17
22
2325
2425
22
20
19
19
20
5
18
5
18
M04-3437-21
16
15
16
2
M04-3437-5
9
6
2
10
11
12
13
10
14
8
7
26
