TM 1-1520-238-23
Change 1
3-53
3.16.
MAIN LANDING GEAR TRAILING ARM ASSEMBLY REMOVAL/INSTALLATION continued
a. Install cap (25) packing (26) and retainer (27)
on right trailing arm (3). Torque two bolts (28) to
20 INCH-POUNDS.
(1) Lubricate new packing (26). Use petrolatum
(item 138, App F).
(2) Install packing (26) on cap (25).
(3) Install cap (25) on trailing arm (3).
(4) Install retainer (27) inside trailing arm (3) un-
der cap (25). Install two bolts (28) through
washers (30), cap (25), and retainer (27).
(5) Hold two bolts (28). Install washers (30) and
nuts (29).
(6) Torque two bolts (28) to 20 INCH-POUNDS.
Use torque wrench.
b. Install cap (19) and packing (20) with squat
switch bracket (18) and retainer (21) on left
trailing arm (3).
(1) Lubricate new packing (20). Use petrolatum
(item 138, App F).
(2) Install packing (20) on cap (19).
(3) Install cap (19) on trailing arm (3).
(4) Install bracket (18) on cap (19) so that face of
bracket (18) is facing forward when trailing
arm (3) is installed.
(5) Position retainer (21) inside trailing arm (3)
under cap (19). Install two bolts (22) and
washers (24) through bracket (18), cap (19),
and retainer (21).
(6) Hold two bolts (22). Install two washers (24)
and nuts (23). Do not tighten.
GO TO NEXT PAGE
M04-055-14
M04-055-15
25
26
28
30
3
3029
27
RIGHT SIDE
M04-055-16
18
20
22
24
3
2423
21
19
LEFT SIDE
