TM 1-1520-238-23
4-679
4.185.
NO. 1 AND NO. 2 ENGINE LOAD DEMAND SPINDLE RIGGING continued
aj. Inspect (QA).
ak. Remove external power electrical (para 1.70).
al. Install No. 1 or No. 2 engine shroud assembly (para 4.103).
am. Secure access doors LN1 and RN1; install panel L200 and R200 (para 2.2).
an. Perform power plants maintenance operational check (engine No. 1 and engine No. 2)
(TM 1-1520-238-T).
END OF TASK