TM 1-1520-238-23
4-675
4.185.
NO. 1 AND NO. 2 ENGINE LOAD DEMAND SPINDLE RIGGING continued
l. Install cable rod end (6) to bellcrank (2).
Torque nut (9) 14 to 18 INCH-POUNDS.
(1) Hold cable (32) on flats (33). Loosen nuts
(34) and (35).
(2) Adjust cable (32) to aline rod end (6) with
bellcrank (2).
(3) Install bolt (8) in bellcrank (2) and rod end (6).
(4) Install nut (9) on bolt (8). Torque nut (9) to 14
INCH-POUNDS. Use torque wrench.
(5) Increase torque to aline cotter pin hole, but do
not exceed 18 INCH-POUNDS.
(6) Install new cotter pin (7).
m. Hold cable (32) on flats (33). Torque nuts (34)
and (35) to 90 INCH-POUNDS. Use torque
wrench.
n. Hold cable (28) on flats (29). Torque nuts (30)
and (31) to 90 INCH-POUNDS. Use torque
wrench.
o. Remove 7 rig pin (15) from bracket (16) and
bellcrank (2).
GO TO NEXT PAGE
M04-1210-13
2
7
9
6
33
34
35
8
32
M04-1210-14
29
30
33
31
28
32
34
35
15
2
16
M04-1210-15