TM 1-1520-238-23
4-676
4.185.
NO. 1 AND NO. 2 ENGINE LOAD DEMAND SPINDLE RIGGING continued
p. Remove rig pin (18) from gearbox (19) zero
degree rig pin hole (21).
q. Remove rig pin (23) from gearbox (24) zero
degree rig pin hole (27).
r. Install 7 rig pin (15) in top hole (36) of bracket
(16) and bellcrank (2).
(1) Push bellcrank (2) down to aline holes.
(2) Install 7 rig pin (15).
s. Apply external power electrical (para 1.70).
t. Apply external power hydraulic (primary)
(para 1.72).
u. Move collective stick (37) to full down posi-
tion.
GO TO NEXT PAGE
M04-1210-16
19
21
18
M04-1210-17
23
27
24
M04-1210-18
16
2
15
15
36
PILOT STATION
M04-1210-19
37