TM 1-1520-238-23
4-729
4.198.
CPG POWER QUADRANT LEVER RELEASE SWITCH REMOVAL/INSTALLATION
(AVIM)
4.198.1. Description
This task covers:
Removal. Cleaning. Inspection. Installation.
4.198.2. Initial Setup
Tools:
Electrical tool kit (item 378, App H)
Light duty laboratory apron (item 27, App H)
Chemical protective gloves (item 154, App H)
Adjustable air filtering respirator (item 262, App H)
Materials/Parts:
Wire cap (2)
Sealing compound (item 172, App F)
Tape (item 202, App F)
Personnel Required:
68X
Armament/Electrical System Repairer
68X3F
Armament/Electrical System Repairer/
Technical Inspector
References:
TM 55-1500-323-24
NOTE
This task is typical for CPG power quad-
rant engine No. 1 or No. 2 lever release
switch.
4.198.3. Removal
a. Depin wire (1) from receptacle J1 (2).
(1) Remove lacing tape as required.
(2) For engine No. 1, identify and depin wire (1)
from
pin
4
of
receptacle
J1
(2)
(TM 55-1500-323-24).
(3) For engine No. 2, identify and depin wire (1)
from
pin
5
of
receptacle
J1
(2)
(TM 55-1500-323-24).
b. Detach wires (3), (4), and (5).
(1) Identify and detach wires (3), (4), and (5) from
wire cap (6) (TM 55-1500-323-24). Discard
wire cap (6).
GO TO NEXT PAGE
M04-3336-1
6
3
5
4
1
2
2