TM 1-1520-238-23
9-88
9.24.
ELECTRICAL POWER DISTRIBUTION BOX POWER TRANSFORMER T1 OR T2 REPLACEMENT
(T701-GE-701) continued
9.24.6. Installation
a. Install new transformer (1) on support (2).
(1) Position transformer (1) on support (2).
(2) Install screw (3) and washer (4).
NOTE
Wires for transformer T1 are attached to
A402TB3-14 and wires for transformer
T2 are attached to A402TB3-15.
b. Pin identified wires (6) and (5).
(1) Pin two identified wires (6) in splices (8)
(TM 55-1500-323-24).
(2) Pin four identified wires (5) in terminal block
(7) (TM 55-1500-323-24).
c. Perform
electrical
bond
check
(TM 55-1500-323-24).
(1) Bond shall be 0.0025 OHM or less. Use
ohmmeter.
d. Inspect (QA).
e. Perform power plants maintenance operation-
al check (engine 1 and engine 2)
(TM 1-1520-238-T).
f. Install electrical power distribution box cover
(para 9.9).
END OF TASK
1
2
4
3
M04-4522-5
6
8
M04-4522-6
7
5