i
TM 1-1520-238-23
9-115
9.32.
TRANSFORMER-RECTIFIER NO. 2 REMOVAL/INSTALLATION continued
d. Detach four wires (4) from positive and nega-
tive terminals (5).
(1) Identify four wires (4).
(2) Remove two nuts (6), lockwashers (7), and
four terminal lugs (8).
e. Remove clamp block (9) from hydraulic lines
(10) and longitudinal servoactuator (11).
(1) Remove hex screw (12) and washer (13).
(2) Remove clamp block (9).
f. Remove transformer-rectifier No. 2 (2) from
mount (14).
(1) Remove four bolts (15) and washers (16).
(2) Remove transformer-rectifier No. 2 (2).
9.32.4. Cleaning
a. Clean removed and attaching parts (para
1.47).
GO TO NEXT PAGE
4
7
8
6
M04-1097-4
5
12
13
9
10
9
11
M04-1097-9
16
15
M04-1097-10
2
14