TM 1-1520-238-23
9-167
9.50.
GROUND SERVICE UTILITY RECEPTACLE REMOVAL/INSTALLATION
9.50.1. Description
This task covers:
Removal. Cleaning. Inspection. Installation.
9.50.2. Initial Setup
Tools:
Electrical tool kit (item 378, App H)
Light duty laboratory apron (item 27, App H)
Chemical protective gloves (item 154, App H)
Ohmmeter (item 218, App H)
Adjustable air filtering respirator (item 262, App H)
25-watt electric soldering iron (item 332, App H)
Materials/Parts:
Solder (item 189, App F)
Personnel Required:
68X
Armament/Electrical System Repairer
68X3F
Armament/Electrical System Repairer/
Technical Inspector
References:
TM 1-1520-238-T
TM 55-1500-323-24
Equipment Conditions:
Ref
Condition
1.57
Helicopter safed
2.2
Access fairing R60 removed
9.50.3. Removal
a. Enter pilot station (para 1.56). Observe all
safety precautions.
b. On pilot aft circuit breaker panel, open six
POWER circuit breakers.
GO TO NEXT PAGE
M04-1305-1