TM 1-1520-238-23
Change 3
11-205
11.41.
CPG COLLECTIVE STICK SUPPORT REMOVAL/INSTALLATION continued
c. Install rod end (1) on support (2). Torque nut (4)
30 to 40 INCH-POUNDS.
(1) Aline rod end (1) with support (2).
(2) Install bolt (5) through washer (6), bushing
(7), support (2), and rod end (1).
(3) Check fit of self-retaining bolt (5) (para 11.1).
(4) Install nut (4). Torque nut (4) to 30 INCH-
POUNDS. Use torque wrench.
(5) Increase torque to aline cotter pin hole, but do
not exceed 40 INCH-POUNDS.
(6) Install new cotter pin (3).
d. Install brake line (8).
(1) Install two nuts (10).
(2) Install clamp screw (9).
e. Install CPG collective stick cylinder (para
11.40).
f. Install CPG collective control position LVDT
(para 11.204).
g. Install CPG collective stick (para 11.21).
h. Perform collective flight control rigging main-
tenance operational check (TM 1-1520-238-T).
i. Perform DASE maintenance operational
check (TM 1-1520-238-T).
j. Install CPG seat (para 2.161).
k. Service and bleed main landing gear system
(para 1.45).
l. Install area weapon, turret, and flex chute
(TM 9-1090-208-23-1).
END OF TASK
1
7
4
3
M04-3459-5
5
6
2
8
9
10
M04-3459-7A
10