TM 1-1520-238-23
11-311
11.67.
CPG CYCLIC STICK AND LATERAL LINK INSTALLATION continued
b. Install cyclic stick link (1) on CPG cyclic stick
(2). Torque nut (3) 30 to 40 INCH-POUNDS.
(1) Aline link (1) and stick (2).
(2) Install bushing (4) in stick (2).
(3) Install bolt (5) through washer (6), bushing
(4), stick (2), and link (1).
(4) Check fit of self-retaining bolt (5) (para 11.1).
(5) Install washer (6) and nut (3).
(6) Torque nut (3) to 30 INCH-POUNDS. Use
torque wrench.
(7) Increase torque to aline cotter pin hole, but do
not exceed 40 INCH-POUNDS.
(8) Install new cotter pin (7).
c. Install stick (2) on housing (8).
(1) Extend stick (2).
(a) Pull finger lock lever (9).
(2) Hold housing (8) in full aft position.
(3) Slide pin (10) aft through housing (8) and link
(1) in arm assembly (11).
GO TO NEXT PAGE
M04-1677-2
7
3
4
6
1
2
5
6
M04-1677-7
2
9
8
10
10
1
8
M04-1677-4
11