TM 1-1520-238-23
11-312
11.67.
CPG CYCLIC STICK AND LATERAL LINK INSTALLATION continued
d. Install retainer (12) on pin (10).
(1) Position retainer (12) on pin (10).
(2) Install bolt (13) through washer (14) and re-
tainer (12).
(3) Install washer (15) and nut (16).
e. Install two tiedown straps (17) on brackets
(18) and (19). Use strap (item 192, App F).
f. Install link (1) on arm (11). Torque nut (20) 30 to
40 INCH-POUNDS.
(1) Install bushing (21) in arm (11).
(2) Install bolt (22) through bushing (21), arm
(11), and link (1).
(3) Check fit of self-retaining bolt (22) (para
11.1).
(4) Install nut (20). Torque nut (20) to 30 INCH-
POUNDS. Use torque wrench.
(5) Increase torque to aline cotter pin hole, but do
not exceed 40 INCH-POUNDS.
(6) Install new cotter pin (23).
GO TO NEXT PAGE
M04-1677-5
13
14
12
1516
10
M04-1677-15
17
19
18
21
22
1
11
M04-1677-6
23
20